Equipment-Specific Sticky Mat
Equipment-Specific Sticky Mat
Our Equipment-Specific Adhesive Mat provides targeted protection for valuable machinery and sensitive equipment in clean manufacturing environments. Designed to be placed directly under or around precision equipment, it creates a dedicated contamination-control zone that captures falling particles, footborne debris, and rolling contamination before they can compromise your equipment's performance or the products being processed.
Key Features & Specifications
Application
- Precision equipment bases, inspection machine peripherals, cleanroom machinery installation areas, and specialized workstation floors in semiconductor, medical device, and precision optics manufacturing.
Material & Construction
- Base Film: Ultra-durable, tear-resistant Polyethylene (PE) or Polyvinyl Chloride (PVC) capable of withstanding equipment weight and chemical exposure
- Adhesive Layer: High-tack, pressure-sensitive acrylic adhesive with consistent surface coverage
- Backing: Full-coverage non-slip rubber backing with enhanced grip properties
- Special Features: Available in anti-static and chemical-resistant formulations
Available Colors
- Blue: Standard equipment protection
- Black: For high-traffic equipment areas where visible dirt masking is preferred
- Custom: Size and color matching to equipment footprint
Performance & Technical Data
| Feature | Description |
|---|---|
| Material | polyethylene |
| Viscosity | 250g-550g |
| Size | Customized according to customer needs |
| Thickness | 3C-6C |
| Layer | 1-30,1-60 |
| Color | blue, white, transparent, gray |
| Packing | 30 layers/piece, 10 pieces/box 60 layers/piece, 5 pieces/box |
How to Use
- Clean Floor Surface: Ensure installation area is completely clean and dry
- Position Mat: Place mat with backing side down at equipment location
- Remove Bottom Liner: Peel off protective film from bottom surface
- Secure Placement: Press mat firmly into position on floor
- Remove Top Liner: Peel off protective film from adhesive surface
- Install Equipment: Place or roll equipment onto mat surface
- Maintain: Replace when top layer shows significant contamination buildup
Product Packaging

